介绍了柳钢转炉炼钢厂OG湿法除尘改LT干法除尘的技术改造项目实施过程。在技改过程根据实际情况,设计转炉粗灰回炉的装置。目前柳钢转炉干法除尘的技术改造项目运行良好,达到预期效果。
The implementation process of the technical renovation project of OG wet dedusting converting into LT dry dedusting in Liu Zhou iron&steel converter furnace steelmaking plant is introduced. According to the actual situation in the technical renovation project,the device of coarse ash return furnace of converter is designed.At present,the technical renovation project of dry dedusting in Liu Zhou iron&steel converter furnace steelmaking plant runs well and achieves the expected effect.
作者
王会超
Wang Huichao(Guangxi Liuzhou Iron and Steel Group Co.,Ltd.,Liuzhou 545002)
出处
《冶金设备》
2019年第3期78-80,70,共4页
Metallurgical Equipment
关键词
湿法除尘
干法除尘
转炉
Wet dedusting
Dry dedusting
Converter