大华桥水电站桥架安装及电缆敷设工艺优化 被引量:3

Optimization on Cable Bridge Installation and Cable Laying Process in Dahuaqiao Hydropower Station
下载PDF
导出
摘要 针对目前水电站电缆桥架安装、电缆敷设存在的质量通病,大华桥水电站在建设过程中,归纳和总结了桥架安装、电缆管安装、电缆敷设、二次配线等施工工艺改进和优化方案,以及安装过程中需注意的问题,确保了大华桥水电站桥架安装、电缆敷设排列整齐、整体美观。该电站电缆桥架安装和电缆敷设的成功能够为其他电站达标投产和创优提供了很好的借鉴作用。 In view of the common quality problems existing in cable bridge installation and cable laying of hydropower stations at present, the problems that need to be improved in the construction of bridge installation, cable pipe installation, cable laying and secondary wiring, as well as the problems needing attention in installation process during the construction of Dahuaqiao Hydropower Station are summarized and optimized. The optimization ensures that the cable bridge installation and cable laying process of Dahuaqiao Hydropower Station are neatly and beautifully arranged. The success of cable bridge installation and cable laying in this power station also provides a good reference for other power stations.
作者 詹维勇 李长耘 ZHAN Weiyong;LI Changyun(Huaneng Lancang River Hydropower Co . , Ltd . , Kunming 650214, Yunnan,China;College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, Jiangsu, China)
出处 《水力发电》 北大核心 2019年第6期100-103,共4页 Water Power
关键词 桥架 电缆敷设 工艺优化 大华桥水电站 cable bridge structure cable laying process optimization Dahuaqiao Hydropower Station
  • 相关文献

参考文献3

二级参考文献6

  • 1建设部.智能建筑工程质量验收规范GB50339—2003(第一版).中国建筑工业出版社,2003年9月.. 被引量:1
  • 2建设部.民用建筑电气设计规范JGJ/T16—92(第一版).中国计划出版社,1993年10月.. 被引量:1
  • 3部分电缆桥架生产厂家产品样本 被引量:2
  • 4建设部.建筑电气工程施工质量验收规范GB50303—2002(第一版).中国计划出版社,2002年5月.. 被引量:1
  • 5建设部,信息产业部.建筑与建筑群综合布线系统工程设计规范GB/T50311—2000(第一版).中国计划出版社,2000年5月.. 被引量:1
  • 6建设部,信息产业部.建筑与建筑群综合布线系统工程验收规范GB/T50312—2000(第一版).中国计划出版社,2000年5月.. 被引量:1

共引文献4

同被引文献15

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部