期刊文献+

基于差值迭代法的斜拉桥施工索力计算分析 被引量:3

Cable Force Calculation and Analysis of Cable-stayed Bridge Construction Based on Difference Iteration Method
下载PDF
导出
摘要 在斜拉桥施工控制中,为了达到设计成桥状态目标,需要对施工索力进行精确计算.以某斜拉桥为例,通过差值法进行正装迭代分析,通过迭代消除不闭合问题,使索力精确收敛于设计成桥索力.结果表明:该方法数学概念简单且不需要提取影响矩阵,整个计算过程简便易行,在斜拉桥施工控制中具有较好的精度和分析效率,可减少计算过程中受过多不确定因素影响,对解决类似问题可提供有益参考. In the construction control of cable-stayed bridges,in order to achieve the goal of bridge state design,it is necessary to calculate the construction cable force accurately.Taking a cable-stayed bridge as an example,the forward-loading iteration analysis is carried out by the difference method,and the unclosed problem is eliminated by iteration,so that the cable force can converge to the designed cable force accurately.The example proves that the method is simple in mathematical concept and does not need to extract the influence matrix.The whole calculation process is simple and easy.It has more accurate and analysis efficiency in the construction control of cable-stayed bridges,and can reduce too much imprecision in the calculation process.The influence of certain factors can provide useful reference for solving similar problems.
作者 张录斌 ZHANG Lu-bin(School of Civil Engineering,Lanzhou Jiaotong University,Lanzhou 730070,China)
出处 《兰州工业学院学报》 2019年第3期14-17,共4页 Journal of Lanzhou Institute of Technology
关键词 斜拉桥 施工索力 差值法 正装迭代法 cable-stayed bridge construction cable tension force differential method forward-analysis iterative method
  • 相关文献

参考文献4

二级参考文献21

共引文献116

同被引文献33

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部