摘要 针对某矿向深部延深掘进的具体地质生产条件,设计了物探与钻探相结合的超前探水方案,并进行了巷道底板注浆加固方案设计、施工及效果检验。根据注浆前后的对比可以得出,注浆后探水钻孔的涌水量基本为零,且物探表明注浆后底板富水异常情况显著减少,表明实现了较好的注浆效果。 According to the specific geological production conditions of deep excavation in a mine, the advanced water exploration scheme combining geophysical exploration and drilling is designed, and the design, construction and effect test of roadway floor grouting reinforcement scheme are carried out. According to the comparison before and after grouting, it can be concluded that the water inflow of the exploratory boreholes after grouting is basically zero, and the geophysical prospecting shows that the abnormal water-rich situation of the floor is significantly reduced after grouting,indicating that the better grouting effect has been achieved.
作者 贾银 Jia Yin(Datong Coal Mine Group Yongdingzhuang Coal Industry Co.,Ltd.,Datong Shanxi037000)
出处 《山西冶金》 CAS 2019年第2期83-84,87,共3页 Shanxi Metallurgy
关键词 奥灰水 超前探水 底板注浆加固 安全隔水层 物探 ordovician limestone water advanced water exploration floor grouting reinforcement safe water barrier geophysical prospecting
  • 相关文献

参考文献6

二级参考文献47

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部