藕池东支—华容河航道一期工程船闸地基处理研究 被引量:1

Research on the Foundation Treatment of Ship Lock Engineering of on the East of Ouchi in Hunan Province-the First Phase Project of Huarong River Channel
下载PDF
导出
摘要 文章基于湖南省藕池东支——华容河航道一期工程,详细介绍了船闸工程概况和工程地质概况。目的是为加快施工进度,保证按时通航;拟采用施工周期较短的预应力混凝土管桩替代原CFG桩对地基进行加固处理;变更后,方案满足地基承载力要求,同时有效降低工期,可为后续类似工程提供参考。 Based on the east of Ouchi in Hunan Province-the first phase project of Huarong River Channel,the general situation of ship lock engineering and engineering geology were introduced in detail.In order to speed up the construction progress and ensure timely navigation,the prestressed concrete pipe pile with shotrt construction period was used to replace the original CFG pile to reinforce the foundation.The modified scheme met the requirement of bearing capacity of foundation and effectively reduces the construction period,which can provide reference for similar projects in the future.
作者 田槐湘 TIAN Huai-xiang(Hunan Habor Engineering Co.,Ltd.,Changsha,Hunan 410009,China)
出处 《企业技术开发》 2019年第5期14-17,共4页 Technological Development of Enterprise
关键词 船闸工程 地基处理 承载力 预应力混凝土管桩 Ship lock engineering Foundation treatment Bearing capacity Prestressed concrete pipe pile
  • 相关文献

参考文献5

二级参考文献8

  • 1中交水运规划设计院.JTJ305-2001船闸总体设计规范[S].北京:人民交通出版社,2001. 被引量:2
  • 2长江水利委员会长江勘测规划设计研究院.SL252-2000 水利水电工程等级划分及洪水标准[S].北京:中国水利水电出版社,2000. 被引量:17
  • 3黑龙江省水利水电勘测设计研究院.发生渠船闸设计[R].哈尔滨:黑龙江省水利水电勘测设计研究院,2011. 被引量:1
  • 4黑龙江蓝波建筑工程检测有限公司.发生渠船闸桩基检测报告[R].哈尔滨:黑龙江蓝波建筑工程检测有限公司,2012. 被引量:1
  • 5JTJ 307-2001.船闸水工建筑物设计规范[S],2001. 被引量:1
  • 6陈德华,宗超男,余锦江.浅谈淤泥质软土地基处理[J]中国水利,2003(10). 被引量:1
  • 7李强,王萍.钻孔灌注桩在水闸软基处理中的应用[J].水利技术监督,2012,20(5):73-75. 被引量:8
  • 8郑文雄,刘海涛,聂军洲.水泥土搅拌桩施工工艺及质量控制[J].水利科技与经济,2013,19(9):94-95. 被引量:2

共引文献3

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部