统筹规划、合理配置长线先张法预制U型梁制梁台座 被引量:2

Overall Planning and Rational Allocation of Long-Line Beam Made Pedestal for Prefabricated U-Beam by Pre-Tensioning Method
下载PDF
导出
摘要 某轨道交通工程预制U型梁,采用一联三片长线先张法施工,因梁型繁多,长度、结构尺寸、钢绞线数量、位置各不相同,施工前应统筹规划、合理配置专用和公用制梁台座类型,从而配置模板、张拉设备,均衡各生产线的生产能力、减少模板调节块配置、减少模板改制时间,保证施工平稳有序、节约经济成本。 A precast U beam of a rail transit project is constructed by the pretensioning method for three-plate beam. Due to the wide variety of beam types, the length, structure size, number and location of steel strand are different, the construction should be planned as a whole, reasonable allocation of dedicated and public beam pedestal type, so as to configure the template, tension equipment, balance the production capacity of each production line, reduce the template adjustment block configuration, reduce the formwork restructuring time,ensure the smooth and orderly construction, saving economic costs.
作者 郑涛 张强 刘学 ZHENG Tao;ZHANG Qiang;LIU Xue(The Third Engineering Co. Ltd.ofthe First Highway Engineering Bureau of CCCC,Beijing 101102,China)
出处 《工程建设与设计》 2019年第10期113-114,共2页 Construction & Design for Engineering
关键词 先张法 预制U型梁 制梁台座 pre-tensioning method prefabricated U-shaped beam beam-made pedestal
  • 相关文献

参考文献1

  • 1张宇宁..先张法预应力槽形梁设计与施工技术研究[D].西南交通大学,2009:

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部