摘要
采用现场调研的方法,详细分析了斜沟煤矿的生产系统以及23114综放工作面的重要运输设备以及其具体运输尺寸,利用理论分析以及工程类比的方法对斜沟煤矿23114综采放顶煤工作面设备安装进行了系统分析,确定了23114综放工作面设备安装路线、运输顺序以及安装方法,实现了该工作面设备的科学快速安装。
The production system of Xiegou Coal Mine and the important transportation equipment in the 23114 fully mechanized top coal caving face and the specific transportation dimensions are analyzed in detail by means of field investigation. The equipment installation of 23114 fully mechanized top coal caving face in Xiegou Coal Mine is systematically analyzed by theoretical analysis and engineering analogy. The equipment installation route, transportation sequence and installation method of 23114 fully mechanized top coal caving face are determined. The scientific and rapid installation of the working face equipment is realized.
作者
孙志勇
Sun Zhi-yong(Xiegou Coal Mine, Shanxi Xishan Jinxing Energy Co., Ltd., Shanxi Xingxian 033600)
出处
《山东煤炭科技》
2019年第5期16-18,共3页
Shandong Coal Science and Technology
关键词
综放
安装
工艺
fully mechanized caving
installation
process