盾构隧道穿越城际高速铁路桥梁变形安全控制研究 被引量:8

STUDY ON DEFORMATION AND SAFETY CONTROL OF SHIELD TUNNEL PASSING THROUGH UNDER INTERCITY HIGH-SPEED RAILWAY BRIDGE
下载PDF
导出
摘要 武汉市地铁某区间下穿城际高速铁路桥梁,为保证盾构下穿期间的既有铁路运营安全,从优化区间线路、加强管片设计、隔离保护设置、列车限速、地面注浆、盾构施工控制等方面,提出处理方案和保护措施。采用FLAC3D有限差分分析软件,建立三维数值模型,分析结果表明,盾构隧道施工引起城际高速铁路桥梁变形满足要求。 A subway line in Wuhan city passes through under an intercity high-speed railway bridge. To guarantee the safety of existing railway operation during shield construction, relevant treatment schemes and protection measures were proposed on the aspects of interval line optimization, strengthening tunnel segment design, setting of isolation protection, speed limitation, ground grouting and shield construction control, etc.;Finite-difference analysis software FLAC3D was used to create a threedimensional numerical model. The analysis result showed that the intercity high-speed railway bridge deformation caused by shield tunnel construction is acceptable.
作者 王洪涛 熊朝晖 吴贤国 WANG Hong-tao;XIONG Zhao-hui;WU Xian-guo(China Construction Third Engineering Bureau Infrastructure Engineering Co., Ltd., 430065, Wuhan, China;China Railway No.4 Surveyand Design Institute Group Co., Ltd., 430063, Wuhan, China;School of Civil Engineering and Mechanics, Huazhong University of Scienceand Technology, 430074, Wuhan, China)
出处 《建筑技术》 2019年第5期524-526,共3页 Architecture Technology
关键词 盾构隧道 穿越铁路 仿真分析 shield tunnel passing through under railway simulation analysis
  • 相关文献

参考文献4

二级参考文献10

共引文献29

同被引文献79

引证文献8

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部