期刊文献+

综合管廊近距离下穿热力方沟沉降控制技术 被引量:6

SETTLEMENT CONTROL TECHNOLOGY FOR UNDERGROUND PIPELINE COLLIGATE ALURE PASSING THROUGH THERMAL SQUARE DITCH
下载PDF
导出
摘要 北京市通州区某新区综合管廊工程近距离暗挖下穿玉带河大街及现况热力方沟,施工中采取深孔注浆止水及加固土体、超前地质探测、初支快速封闭、初支背后回填注浆及动态监控测量等技术,减少了对热力方沟的扰动,将沉降控制在允许范围内,保障了热力方沟的安全运行。 There are series of technical measures adopted in the process of pipeline colligate alures passing through under existing thermal square ditch, include deep hole grouting to stop water and reinforce soil, advanced geological exploration, initial support structure fast sealing, initial support structure backfilling grouting and dynamic monitoring measurement etc. These series of technical measures reduced the disturbance of the construction to the thermal square ditch, control the settlement within the allowable range. It ensures the safe operation of the thermal square ditch.
作者 孙佳伟 SUN Jia-wei(Beijing Investment Group Co., Ltd., 100029, Beijing, China)
出处 《建筑技术》 2019年第5期516-519,共4页 Architecture Technology
关键词 综合管廊 深孔注浆止水及加固 沉降控制 pipeline collogate alures deep hole grouting to stop water and reinforce soil settlementcontrol
  • 相关文献

参考文献1

二级参考文献6

共引文献7

同被引文献52

引证文献6

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部