期刊文献+

深厚覆盖层上沥青混凝土心墙坝二维有限元分析 被引量:2

Analysis on Two-dimensional Finite Element of Asphalt Concrete Core Wall Dam on Deep Overburden
下载PDF
导出
摘要 新疆托帕水库沥青混凝土心墙坝位于深厚覆盖层上。采用邓肯-张E-μ模型对大坝进行二维有限元计算。结果显示,大坝变形值及分布规律是合理的,大坝及心墙的应力水平小于1,不会破坏,大坝是安全稳定的。结果可为工程建设提供理论依据。 The asphalt concrete core wall dam of Xinjiang Topa Reservoir is located on the deep overburden. The dam was subjected to two-dimensional finite element calculation using the Duncan-Zhang E-μ model. The results show that the deformation value and distribution law of the dam are reasonable. The stress level of the dam and the core wall is less than 1, and will not be destroyed. The dam is safe and stable. The results can provide a theoretical basis for engineering construction.
作者 胡小虎 Hu Xiaohu(Xinjiang Water Resources and Hydropower Survey and Design Institute Urumqi 830000, Xinjiang)
出处 《陕西水利》 2019年第4期17-18,21,共3页 Shaanxi Water Resources
关键词 邓肯-张E-μ模型 有限元分析 深厚覆盖层 Duncan-Zhang E-μ model finite element analysis and deep overburden
  • 相关文献

参考文献4

二级参考文献9

共引文献46

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部