摘要
现阶段地铁区间施工过程中,尚无统一的建模标准。为提高BIM在地铁区间施工的应用效率,提高管理效率,基于ISO 12006-2分类框架,参照Omni Class分类表,采用混合分类法,构建信息分类体系,提出了地铁区间施工过程信息分类及编码体系方法;并结合WBS以及现有的编码体系,构建了地铁区间施工6级编码体系。通过建立可靠的编码体系,可以将地铁施工过程中的构件进行区分,保证不同构件之间的编码差异性,便于所有构件的信息管理。
There is no modeling standard for construction process of the metro interval tunnel at present. In order to improve the application efficiency of BIM in construction of metro interval tunnel and to improve the management efficiency,based on the ISO12006 2 classification framework and referring to the Omni Class classification table,a mixed classification method is used to build an information classification system,a method for constructing information classification and coding system for construction process of metro interval tunnel is proposed in this paper.Combined with WBS and the existing coding system,a six level coding system for the construction metro interval tunnel is constructed.By establishing a reliable coding system,the components in the subway construction process can be distinguished to ensure the differences in coding between different components,and to facilitate information management for all components.
作者
李顺平
周红
吴松榕
LI Shunping;ZHOU Hong;WU Songrong(China Railway Construction & Investment Group Co.,Ltd.,Shenzhen 518000,China;School of Architecture and Civil Engineering,Xiamen University,Xiamen 361005,China)
出处
《建井技术》
2018年第6期50-55,39,共7页
Mine Construction Technology
基金
国家自然科学基金项目(基于BIM和多源数据集成的地铁施工精准风险评估与实时控制(71871192))
中铁建投2016年科技重大计划项目((2016)01-1)
厦门市交通基础设施智能管养工程技术研究中心开放基金资助项目(No.TCIMI201802)
关键词
地铁区间
施工过程
信息分类
编码体系
metro interval tunnel
construction process
information classification
coding system