云南大坪金矿区东采区开采系统在是新老开发系统结合的开采系统,通过分析生产、通风系统现状及存在的问题,结合矿山现有井巷和通风设施,提出合理、完善的优化改造方案,预期可取得良好的通风效果,为矿山后期生产开发提供有利的通风作业环境。
The mining system of the eastern mining area of Daping Gold Mine is a mining system combining the old and new development systems. By analyzing the current situation and existing problems of production and ventilation systems, combined with the existing mine shafts and ventilation facilities, it proposes a reasonable and perfect optimization and transformation plan. It is expected to achieve good ventilation and provide a favorable ventilation environment for postproduction development in the mine.
作者
林荣平
杨修治
梁尧普
LIN Rong-ping;YANG Xiu-zhi;LIANG Yao-pu(Zijin Mining Group Company Limited, Xiamen 361000,China)
出处
《世界有色金属》
2019年第3期156-158,共3页
World Nonferrous Metals
关键词
大坪金矿
通风
优化
Daping Gold Mine
ventilation
optimization and transformation