光伏发电工程执行概算与设计概算差异性研究 被引量:3

Research on the Difference between the Implementation Estimates and Design Estimates of Photovoltaic Power Generation Project
下载PDF
导出
摘要 执行概算是工程项目实施过程中重要的管理性文件,特别是对于设计周期、实施周期较短的光伏发电工程。在工程实施过程中,通过执行概算单价和已完成合同工程量,以及对设计概算的分解、细化与重组,及时反映工程投资完成情况显得尤为重要。文章通过比较分析光伏发电项目执行概算与设计概算投资的差异性,对光伏发电项目设计概算及执行概算的编制提出了进一步的改进与深化的意见,供相关编制人员参考。 The implementation estimate is an important investment management document for the project construction stage, especially for the project’s short life cycle photovoltaic power generation project. In the process of project implementation, it is very important to reflect the completion of project investment in a timely manner through the execution of unit price and contract quantity and the decomposition,refinement and reorganization of design estimate. Through the comparative analysis of photovoltaic power generation of the difference of investment estimates of project implementation and design estimates, the author puts forward some suggestions for design estimates and investment estimates of photovoltaic power generation project.
作者 薛惠娟 XUE Hui-juan(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处 《价值工程》 2019年第12期15-17,共3页 Value Engineering
关键词 光伏发电项目 执行概算 设计概算 差异分析 photovoltaic power generation project implementation estimates design estimates differences analysis
  • 相关文献

参考文献1

共引文献5

同被引文献8

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部