期刊文献+

建筑工程施工赶工与质量的矛盾解决 被引量:2

Contradictions Between Construction Work and Quality of Construction Projects
下载PDF
导出
摘要 建筑工程具有系统性和复杂性,且包含众多环节。在具体的建筑工程施工中,工程进度与质量控制既对立又统一。如何在保持施工进度的过程中,加强质量控制,已成为建筑施工单位关注的重点。因此,本文以建筑工程施工赶工与质量控制为研究切入点,对其进行了详细的研究和论述。 Architectural engineering is systematic and complex,and contains many links.In the construction of specific construction projects,the progress and quality control of the project are both opposed and unified.How to strengthen quality control in the process of maintaining construction progress has become the focus of attention of construction units.Based on the construction rush and quality control of construction projects as the starting point,this paper carried out a detailed study and discussion.
作者 薄凯雷 BO Kailei(China Hydropower Construction Group Fifteen Engineering Bureau Co.,Ltd.,Xianyang Shaanxi 712000)
出处 《河南科技》 2019年第1期96-97,共2页 Henan Science and Technology
关键词 建筑工程 赶工 施工 质量控制 construction engineering rush work construction quality control
  • 相关文献

参考文献3

二级参考文献6

共引文献1

同被引文献8

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部