期刊文献+

并网光伏电站土建及安装调试工程要点浅析 被引量:1

Analysis on the Main Points of Civil Engineering and Installation and Commissioning of Grid-connected Photovoltaic Power Station
下载PDF
导出
摘要 随着社会的发展,我国的科学技术的发展也有了很大的进步。随之而来的就是开始实行对可再生能源的大量利用,这就大大提升了并网光伏发电站的建设、技术水平。在很短的时间里,我国的装机容量在不断的增长,虽然发展的很迅速,不过在发电站的工作效率以及工作的质量上面没有很好的效果,追其原因都是因为没有科学的规划以及合适的装机建设。针对这个现象,我们将根据我国发电站的发展的现状,以及其出现问题的原因综合进行分析讨论,并从技术和管理这两个方面对并网光伏发电站土建工程与安装调试工程质量上的控制要点进行总结,这对于未来并网光伏发电站的发展有着重要的作用。也希望本文能给大家带来帮助。 With the development of society,the development of science and technology in China has also made great progress. What followed was the beginning of the implementation of the massive use of renewable energy,which greatly improved the construction and technical level of grid-connected photovoltaic power stations.In a short period of time,China’s installed capacity is constantly increasing.Although it is developing very rapidly,it has no good effect on the efficiency of the power station and the quality of the work. The reason for this is because there is no scientific planning.And suitable installation construction.In view of this phenomenon,we will comprehensively analyze and discuss according to the current situation of the development of China’s power stations and the causes of their problems,and the quality of the civil engineering and installation and commissioning of grid-connected photovoltaic power plants from the two aspects of technology and management.The summary of control points is summarized,which plays an important role in the development of future grid-connected photovoltaic power stations.I also hope that this article can help everyone.
作者 魏娜 Wei Na
出处 《电力系统装备》 2019年第4期64-65,共2页 Electric Power System Equipment
关键词 并网光伏电站 土建及安装调试工程 要点浅析 grid-connected photovoltaic power station civil engineering and installation and commissioning engineering
  • 相关文献

参考文献4

二级参考文献17

共引文献10

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部