摘要
在现如今这个飞速发展的时代,隧道的修建是交通和经济发展的一条重要途径。但在隧道暗挖时应多加注意其施工过程和施工结果对临近建筑产生的效应,尽量避免或者减少对桥梁桩基础周边岩石层和土层的影响。以港珠澳大桥为例,主要就隧道暗挖对临近桥梁桩基础的及加工措施进行了探讨和分析,从而为类似工程提供借鉴。
In today's rapidly developing era,the construction of tunnels is an important way of transportation and economic development.However,when the tunnel is dug,pay more attention to the effect of the construction process and construction results on the adjacent buildings,and try to avoid or reduce the impact on the rock layers and soil layers around the bridge pile foundation.Taking the Hong Kong-Zhuhai-Macao Bridge as an example,the tunnel excavation is mainly discussed and analyzed for the adjacent bridge pile foundation and processing measures,thus providing reference for similar projects.
出处
《建筑技术开发》
2019年第4期122-123,共2页
Building Technology Development
关键词
隧道暗挖
施工方法
施工影响
加固措施
tunnel excavation
construction method
construction impact
reinforcement measures