基于BIM的水利工程4D进度监控系统关键技术 被引量:16

4D Progress Monitoring System of Hydraulic Project Based on BIM
下载PDF
导出
摘要 为了实现水利工程建设进度计划的优化和实际进度的实时感知与控制,采用基于BIM的4D进度监控系统可以有效解决施工过程中的"信息孤岛"现象,给施工管理提供新的视角。该系统将采集到的BIM信息放入网络数据库,并通过人机交互即点即显的方式展示出来;利用数据库中的计划进度和现场采集到的实际进度驱动数字化模型,用不同的颜色表示计划进度和实际进度,实现进度偏差的对比,通过异常记录分析和仿真计算,采取赶工措施,确保进度目标的实现。 In the process ofhydraulic engineering construction , in order to achieve real-time sensing and control optimization schedule and actual progress , it used the progress of 4D monitoring system based on BIM , which could effectively solve the construction process of the " information island " phenomenon and provide a new perspective for construction management. The system put the collected BIM information into the network database , which was displayed by means of human-computer interaction , used database in schedule and collected the actual progress of driving digital model , denoted by different color schedules and actual progress , realized the comparative deviation and formulated measures to ensure the realization of schedule through the abnormal records analysis and calculation.
作者 陶玉波 蔺志刚 董甲甲 TAO Yubo;LIN Zhigang;Dong Jiajia(Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China)
出处 《人民黄河》 CAS 北大核心 2019年第3期135-139,共5页 Yellow River
关键词 4D进度监控系统 虚拟建造 进度采集 进度优化 水利工程施工 4D progress monitoring system virtual construction progress collection schedule optimization hydraulic engineering construction
  • 相关文献

参考文献2

二级参考文献14

共引文献27

同被引文献147

引证文献16

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部