摘要
结合工程实例,介绍了预留孔穿钢棒进行盖梁施工的方法,并对施工工艺流程及操作要点进行了阐述。实践表明,预留孔穿钢棒支撑法以其施工优越性获得了良好的应用效果。
Combined with the engineering example, the method of constructing the cover beam with the steel bar with reserved hole is introduced, and the construction process and operation points are expounded. The practice shows that the method of perforating steel bar with reserved hole has good application effect because of its superiority in construction.
作者
郭俊江
GUO Junjiang(Guangdong No.2 Hydropower Engineering Co.,Ltd,Guangzhou 511340,China)
出处
《广东水利水电》
2019年第2期40-43,共4页
Guangdong Water Resources and Hydropower
关键词
盖梁
预留孔
穿钢棒
Cover beam
the reserved hole
through the steel bar