湖相沉积土层超长灌注桩承载力数值模拟研究 被引量:2

Study on Numerical Simulation of Bearing Capacity of Super-Long Cast-in-Place Pile in Lacestrine Sedimentary Soil
下载PDF
导出
摘要 在施工过程中使用超长钻孔灌注进行支撑时,经常会出现孔壁坍塌、缩颈、桩底沉渣等一系列现象,这些问题往往使得工程不能及时合理地完成,因此针对这一问题,本文结合岳常高速公路TJ-05标段施工实践,对湖相沉积土层超长灌注桩承载力数值进行模拟研究,并对造成该问题的因素进行分析,找出有效解决方案并提出相应的防治措施,也为今后此类问题的处理打下良好基础。 in the course of construction , a series of phenomena , such as wall collapse, neck reduction, pile bottom sediment , etc., often occur when using ultra-long borehole perfusion for support. These problems often make it impossible to complete the project in a timely and reasonable manner. Therefore , aiming at this problem , Based on the construction practice of the TJ-05 standard section of Yuecheng Expressway , the paper simulated the bearing capacity of the Super long perfusion pile in the lake sedimentary layer , analyzed the factors causing the problem , and found out the effective solutions and put forward the corresponding prevention measures. It also provides a good basis for addressing such issues in the future.
作者 吴云川 WU Yunchuan(School of Architecture and Urban Planning, Yunnan University, Kunming 650504, China)
出处 《四川建材》 2019年第2期71-72,74,共3页 Sichuan Building Materials
关键词 湖相沉积土层 超长灌注桩 承载力需求 lake sediments ultra -long perfusion piles capacity requirements
  • 相关文献

参考文献7

二级参考文献11

共引文献42

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部