摘要
新疆某工程大坝为混合坝,左岸及主河床布置混凝土重力挡水坝段,右岸阶地布置沥青混凝土心墙堆石坝段。通过经济、技术比选,认为包裹式接头具有安全性较强的优势。本工程选用包裹式接头方案。
A dam in Xinjiang is a mixed dam.Concrete gravity retaining dam sections are arranged on the left bank and main river bed,and asphalt concrete core rockfill dam sections are arranged on the right bank terrace.Through economic and technological comparison,it is considered that wrapped joints have strong security advantages.The wrapped joint scheme is selected in this project.
作者
胡小虎
HU Xiao-hu(Xinjiang Water Conservancy and Hydropower Survey and Design Institute,Urumqi 830000,China)
出处
《水科学与工程技术》
2019年第1期77-79,共3页
Water Sciences and Engineering Technology