超大直径管道明挖法施工关键技术 被引量:1

Key Technology of Open Cut Method for Super-Large Diameter Pipeline Construction
下载PDF
导出
摘要 常规大直径管道一般都采用顶管法施工,明挖法施工相对较少,但案例工程的增压泵站内管道直径达4 m,且埋地深、走向复杂,导致无法进行顶管施工,祗能采用明挖法施工。通过增压泵站超大直径管道明挖法施工实践,分析了超大直径管道明挖法施工的特点与难点,介绍了超大直径管道施工关键技术,并对主要技术要点进行了阐述。 The conventional large diameter pipes are generally constructed by pipe jacking method,and there are few construction cases with open cut method.However,in the engineering case of one booster pump station,the pipeline diameter is 4 m,the buried depth is deep and the pipeline trend is complicated,which make it impossible to carry out pipe-jacking construction and the open cut method construction is the only way.Through the practice on the super-large diameter pipeline open-cut method construction in the booster pumping station,the characteristics and difficulties of the super-large diameter pipeline open-cut method construction are analyzed,the key technologies for super-large diameter pipeline construction are introduced and the main technical points are expounded.
作者 薛智瑶 XUE Zhiyao(Shanghai Construction No.7 (Group) Co.,Ltd.,Shanghai 200050,China)
出处 《建筑施工》 2019年第1期145-147,共3页 Building Construction
关键词 超大直径管道 明挖法施工 关键技术 施工难点 super-large diameter pipeline open cut method construction key technology construction difficulties
  • 相关文献

参考文献3

二级参考文献5

共引文献2

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部