土方卸载周边的既有综合管廊保护方法研究 被引量:1

Research on Protection Method of Integrated Pipe Gallery Around Earthwork Unloading Area
下载PDF
导出
摘要 以上海世博会B片区改造工程为例,在深基坑开挖过程中对邻近的地下综合管廊保护措施进行了研究,并介绍了基坑不同施工阶段时相应的地下综合管廊保护措施。实测监测数据表明,该保护措施效果显著,整个施工过程中管廊变形量均满足市政部门监管的严格要求。 Taking the renovation project of Shanghai World Expo B-Zone as an example,in the excavation process of deep foundation pit,the protection measures of adjacent underground integrated pipe gallery are studied,and the corresponding underground integrated pipe gallery protection measures for different construction stages are introduced.The actual monitoring data indicate that the protection measures are effective,and the deformation of the pipe gallery in the whole construction process meets the strict requirements of the municipal department's supervision.
作者 吕晓涛 LU Xiaotao(Shanghai Construction Group General Contracting Department,Shanghai 200080,China)
出处 《建筑施工》 2019年第1期63-65,共3页 Building Construction
基金 上海市科学技术委员会科研计划项目(16DZ1200200)
关键词 深基坑开挖 综合管廊 施工保护 变形监测 deep foundation pit excavation integrated pipe gallery construction protection deformation monitoring
  • 相关文献

参考文献6

二级参考文献24

共引文献58

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部