大型水电站建设中不同施工区水土流失特征研究

Study on Water and Soil Loss Features of Various Construction Zones in Construction of Large Hydropower Station
下载PDF
导出
摘要 以金沙江干流中段上已建的大型水电站为例,研究了大型水电站工程建设期内不同施工区的水土流失特征。结果表明:项目区降雨量年内分配差异较大,年际间分配也不均,且降雨量过分集中在汛期;不同施工区的水土流失特征及变化趋势与汛期降雨量及降雨强度关系密切。 Taking the completed large hydropower station in the middle section of the main stream of Jinsha River as an example,the water and soil loss features of various construction zones within construction period were investigated.Results show that the distribution of rainfall in the project area varies greatly during the year and between years,and rainfall is too concentrated in flood season.The water and soil loss features and variation trend are closely related to the rainfall and intensity in flood season.
作者 原海红 张仕艳 Yuan Haihong;Zhang Shiyan(Kunming Engineering & Research Institute of Nonferrous Metallurgy Co.,Ltd.,Kunming 650051,China;Yunnan Xiuchuan Environmental Engineering Technology Co.,Ltd.,Kunming 650021,China)
出处 《有色金属设计》 2018年第4期113-116,共4页 Nonferrous Metals Design
关键词 开发建设项目 水电站工程 不同施工区 水土流失特征 Construction project Hydropower project Various construction zones Water and soil loss features
  • 相关文献

参考文献1

二级参考文献7

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部