摘要
某特高压变电站位于山东鲁南地区,站址地势起伏大,需要半挖半填处理;因此,针对挖方区、浅填方区、深填方区分别采取有效的处理方案,确保将来变电站的安全运行就显得尤为重要。对浅填方区、深填方区、挖方边坡、填方边坡,分别提出有针对性的处理方案。
A UHV substation is located in the Lunan area of Shandong Province.The site is undulating and requires half-filling and semi-filling.Therefore,effective treatment schemes are adopted for the excavation area,shallow filling area and deep filling area to ensure the safety of the substation in the future.Running is especially important.The deep filling area,the excavation side slope and the filling side slope are respectively treated.
作者
李吉林
郝敬国
LI Ji-lin;HAO Jing-guo(Shandong Electric Power Engineering Consulting Institute Ltd.,Jinan 250100,China;Jiangsu Provincial Geological Bureau Fifth Geological Brigade,Xuzhou 221000,China)
出处
《电力勘测设计》
2019年第1期4-6,共3页
Electric Power Survey & Design
关键词
特高压
复杂地质条件
地基处理
UHV
complex geological conditions
processing scheme