摘要
新时期背景下,科学技术的发展速度明显加快,而锅炉制作工艺也更具现代化特征,国内锅炉产品技术指标与国际水平之间的差距明显缩小,而且具备了自主研发并生产锅炉的能力。但需要注意的是,国内电力工业锅炉压力容器与热力管道在安装监督检验方面仍存在诸多不足之处,需要检测工作人员不断优化自身素养水平,贯彻并落实安装监督检验工作,确保工程项目质量满足标准要求,推动企业与行业的可持续发展。文章将电厂锅炉压力容器热力管道作为重点研究对象,阐述其安装监督检验工作的相关内容,希望有所帮助。
under the background of the new period,the speed of the development of science and technology has been speeded up obviously,and the production process of the boiler is more modern,the gap between the technical indexes of domestic boiler products and the international level is narrowed,and the ability to develop and produce boilers independently.However,it should be noted that there are still a lot of shortcomings in the supervision and inspection of the domestic power industry boiler pressure vessels and heat pipes in the installation supervision and inspection.It is necessary to test the staff to continuously optimize their own quality level,implement and implement the installation supervision and inspection work,to ensure the quality of the project to meet the standard requirements,and to promote the enterprises and the industry.Sustainable development.In this case,the article focuses on the thermal pipeline of the boiler pressure vessel in the power plant,and expounds the relevant contents of the installation supervision and inspection work,hoping to help.
出处
《电力系统装备》
2018年第5期247-248,共2页
Electric Power System Equipment
关键词
电厂锅炉
压力容器
热力管道
安装
监督检验工作
Power plant boilers
Pressure vessels
heat pipes
Installation
Supervision and inspection work