摘要 某水电站工程斜坡段压力钢管安装,为加快安装进度,对传统的“逆安法”(逆水流方向延伸钢管安装方法)安装工艺进行创新改良。根据现场情况,研究采用“顺安法”进行斜坡段钢管安装。文章主要介绍斜坡段压力钢管顺安法安装技术。 In order to speed up the installation progress,the installation process of pressure steel pipe in the slope section of a certain hydropower station project was innovatively improved in the traditional“reverse safety method”(installation method of the extension water pipe in the reverse direction of flow).According to the site conditions,the“Shun-an method”was adopted for the installation of steel pipe on the slope section.This article mainly introduces the installation technology of Shunan method for the penstocks in the slope section.
作者 吴峥斌 Wu Zheng-bin
出处 《电力系统装备》 2018年第6期85-86,共2页 Electric Power System Equipment
关键词 压力钢管 斜坡段 顺安法 Pressure pipe Slope section Extension of steel pipe installation method in the direction of water flow
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部