摘要
主要围绕锅炉安装施工的质量控制工作展开研究,通过分析其安装前、安装过程中以及安装后应当采取的质量控制措施,推动各项工作按照合理方式开展,保障锅炉安装的最终质量。
The paper mainly discusses the quality control in the boiler installation construction,analyzes the quality measure control before,during and after the construction,so as to enhance the reasonable implementation of all sorts of steps and guarantee the final quality of the boiler installation.
作者
贾绍玮
Jia Shaowei(Datang Tashan No.2 Power Plant Co.,Ltd of Datong Coal Mine,Datong 037003,China)
出处
《山西建筑》
2018年第31期204-205,共2页
Shanxi Architecture
关键词
锅炉
安装施工
质量控制
boiler
installation construction
quality control