人工钻爆法与机械化钻爆法隧道施工的对比研究 被引量:7

Comparative research on the artificial drilling-blasting method and mechanical drilling-blasting method used in tunnel construction
下载PDF
导出
摘要 针对公路隧道人工钻爆法施工和机械化钻爆法施工的不同,对两种钻爆法施工技术进行了对比研究,分析了人工钻爆和凿岩台车钻爆在施工工艺流程上的区别,并从钻孔设备特点及钻爆施工质量上研究了两种钻爆方法,最后结合某工程实际情况,从施工成本和工程进度两方面对比分析了两种钻爆法的经济性。 In light of the difference of drilling-blasting construction method and mechanical drilling-blasting construction method in highway tunnel construction,comparatively studies their construction technologies,analyzes differences of artificial drilling-blasting method and jumbo drilling method in the aspect of construction technology procedures,and studies two kinds of drilling-blasting construction method from the angle of drilling hole equipment features and drilling-blasting construction quality.In the e n d,combining with the actual engineering conditions,it compares and analyzes the economy of two kinds of drilling-blasting method from two aspects of construction cost and engineering schedule.
作者 穆雪野 丁智勇 陈豪 杨光 Mu Xueye;Ding Zhiyong;Chen Hao;Yang Guang(Shannxi Communication Construction Group Corporation,XV an 710075,China;Major Laboratory of the Education Ministry in Road Construction Technology and Equipment,Chang'an University,Xi'an 710000,China)
出处 《山西建筑》 2018年第8期178-179,共2页 Shanxi Architecture
关键词 隧道施工 人工钻爆法 机械化钻爆法 tunnel construction artificial drilling-blasting method mechanical drilling-blasting method
  • 相关文献

参考文献5

二级参考文献9

共引文献87

同被引文献27

引证文献7

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部