期刊文献+

基于PDCA循环法的文创园区综合计划精细化管理实践——以人民美术文化园为例 被引量:1

Practice of Fine Management of Comprehensive Plan in Wenchuang Park Based on PDCA Cycle Method——Taking the People's Arts Culture Park as an Example
下载PDF
导出
摘要 人民美术印刷厂于2010年将印刷主业迁入亦庄开发区,市区内的老旧厂房面临改造和开发,为确保各项工作顺利完成,必须开展综合计划精细化管理。介绍了PDCA循环的基本内涵,进而将PDCA循环和文创园区综合计划有机结合,提出了基于PDCA循环的综合计划精细化管理体系,经历八年不断实践,人民美术印刷厂华丽转身为人民美术文化园(简称文创园区),以文化创意产业示范基地的新形象展现在世人面前。 The people's arts printing plant moved its main printing business to Yizhuang development zone in 2010,the old factory buildings in the urban area are facing renovation and development,in order to ensure the smooth completion of all the work,the fine management of comprehensive plan must be carried out.This paper introduces the basic connotation of PDCA cycle,and then organically combines PDCA cycle with the comprehensive plan of Wenchuang park,and puts forward the fine management system of comprehensive plan based on PDCA cycle.After eight years of continuous practice,the People's Arts Printing Plant has turned into the People's Arts Culture Park(hereinafter referred to as Wenchuang Park),displaying the new image of cultural and creative industry demonstration base in front of the world.
作者 孙芳 SUN Fang(Beijing Renmei Wenchuang Culture Development Co.Ltd.,Beijing 100007,China)
出处 《中小企业管理与科技》 2018年第9期43-44,共2页 Management & Technology of SME
关键词 PDCA 综合计划 精细化管理 WBS PDCA integrated plan fine management WBS
  • 相关文献

参考文献1

二级参考文献3

共引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部