纳卡拉煤码头项目工程计量理论和管理 被引量:1

Theory and management of quantity survey for Nacala coal terminal project
下载PDF
导出
摘要 工程计量是工程管理的重要内容,是支付项目工程款的依据。通过纳卡拉煤码头项目实例,介绍了项目工程计量的基本定义、条件、范围和程序。结合境外港口工程的合同特点,从预付款、间接费用、期中付款、计量证明文件、工程变更、最终结算等6个方面进行工程计量管理,在国际港口工程建设过程中运用工程计量理论,实现了项目预期管理目标。 Quantity survey is an important part of engineering management and the basis for project payment.Through theexample of Nacala coal terminal project,we introduced the basic definition,condition,scope and procedure of quantity survey.According to the contract characteristics of overseas port project,we implemented the theory and management of quantitysurvey into advance payment,indirect cost,interim payment,measurement document,variation,final settlement.In the processof international port engineering construction,the quantity survey theory is adopted to realize the expected management goal ofthe project.
作者 熊开兵 陈滨 邴守信 XIONG Kai-bing;CHEN Bin;BING Shou-xin(China Harbour Engineering Company Ltd., Beijing 100027, China)
出处 《中国港湾建设》 2017年第9期99-102,共4页 China Harbour Engineering
关键词 工程计量 工程管理 港口工程 quantity survey engineering management port project
  • 相关文献

参考文献4

二级参考文献18

共引文献23

同被引文献1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部