氧气液化装置在工程施工、调试和运行期间出现的问题及优化

Problems during Construction, Commissioning and Operation of Oxygen Liquefaction Project and Optimization
下载PDF
导出
摘要 介绍了10000 m^3/h氧气液化装置的流程及设计参数,重点介绍了氧气液化装置在工程施工、调试和运行期间出现的问题,针对出现的问题提出了一系列的优化改造和操作改进,确保了氧气液化装置的正常投运和日常运行;最后对氧气液化装置投用时机及投用后产生的效益进行了简单介绍。 This paper introduces the process and design parameters of the10000m3/h oxygen liquefying device,with the focus on the problems occurring during engineering construction,commissioning and operation of the oxygen liquefaction device.A series of optimization modification and operation improvement measures were put forward and implemented,which ensured the normal startup and daily operation of the oxygen liquefaction facilities.Finally the commissioning time and economic benefit of the oxygen liquefaction plant were introduced.
作者 洪君 马永进 程杰平 马令军 HONG Jun;MA Yongjin;CHENG Jieping;MA Lingjun(Shougang Qianan Iron & Steel Co., Ltd., Qianan, Hebei 064404, China)
出处 《冶金动力》 2017年第9期43-45,共3页 Metallurgical Power
关键词 氧气 氮气 液化装置 调试 问题 改造 效益 oxygen nitrogen liquefaction plant commissioning problem transformation benefit
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部