摘要
目前阶段,在工业建筑、码头桥梁以及高层楼宇等软地基工程项目中,桩基础的应用更加普遍与广泛。基于此,文章以钻孔灌注桩施工为研究重点,阐述施工过程中存在的质量问题以及具有针对性的控制对策,以期有所帮助。
At present,in the industrial buildings,bridges and high-rise buildings,wharf soft foundation engineering project,the application of the pile foundation is more common and widely.Based on this,the bored pile construction is the focus of the study,this paper expounds the construction process quality problems and has targeted control measures,hoping to help.
作者
陈飞飞
Chen Feifei(Jiangsu Haihong Construction Engineering Co. Ltd, Jiangsu Nantong 226006, China)
出处
《现代盐化工》
2017年第2期74-75,共2页
Modern Salt and Chemical Industry