钢盒新技术在跨铁路连续梁中跨合拢中的应用 被引量:2

Application of the New Technology of Steel Box in Closure for Midspan Bridges in Continuous Beam across Railway
下载PDF
导出
摘要 新建大张高速铁路温家窑特大桥主跨转体连续梁上跨铁路中跨合拢施工时,采用了钢盒进行合拢段的施工新技术,合拢段的所有施工均在钢盒内进行,对铁路行车基本无干扰,不仅完全确保了铁路行车安全,且不需搭设铁路安全防护棚,减少铁路封锁要点的时间及次数,大幅降低了施工成本。 In the closure for midspan bridges of the swing construction of a continuous beam across the railway of the new constructed Datong-Zhangjiakou high-speed railway Wenjiayao super major bridge,all the construction of closure sections is taken in the steel boxes,which has no disturbance to the railway traffic,not only ensures the safe running of railway,but also has no railway safety protection shed,so as to reduce time and the number of the railway points blockade,greatly reducing the construction cost.
作者 燕秋 YAN Qiu(China Railway 17 Bureau Group the 4th Engineering Co.,Ltd.,Chongqing 401121,China)
出处 《价值工程》 2017年第10期104-107,共4页 Value Engineering
关键词 上跨铁路 中跨合拢 钢盒 设计 检算 railroad overbridge closure for midspan bridges steel box design calculation
  • 相关文献

参考文献4

二级参考文献7

共引文献4

同被引文献2

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部