期刊文献+

随机工时下的柔性作业车间调度问题研究 被引量:2

Research on Flexible Job Shop Scheduling Problem with Random Work Time
下载PDF
导出
摘要 本文研究了随机工时下的柔性作业车间调度问题。对随机工时下的柔性作业车间调度问题进行描述,构建了以最大完工时间为优化目标的调度模型,并设计了第二代非支配排序遗传算法(NSGA-II)求解调度问题。 In this paper, flexible job shop scheduling problem with random working time is studied. The flexible job shop scheduling problem with random working time is described. The scheduling model with the maximum completion time is constructed and the secondgeneration non-dominated sorting genetic algorithm (NSGA-II) is designed to solve the scheduling problem.
作者 徐晓娟 XU Xiao-juan(School of Economics and Management,Hebei University of Technology,Tianjin 300401,China)
出处 《价值工程》 2016年第33期24-25,共2页 Value Engineering
关键词 随机工时 柔性作业车间 非支配排序遗传算法(NSGA-II) random work time flexible job shop non-dominated sorting genetic algorithm(NSGA-II)
  • 相关文献

参考文献2

二级参考文献33

  • 1徐震浩,顾幸生.不确定条件下具有零等待的流水车间免疫调度算法[J].计算机集成制造系统,2004,10(10):1247-1251. 被引量:21
  • 2徐震浩,顾幸生.不确定条件下的flow shop问题的免疫调度算法[J].系统工程学报,2005,20(4):374-380. 被引量:19
  • 3徐震浩,顾幸生.不确定条件下的中间存储时间有限的Flow Shop提前/拖期调度问题[J].控制理论与应用,2006,23(3):480-486. 被引量:8
  • 4HICKS C, SONG D P, EARL C F. Dynamic scheduling for complex engineer-to-order products[J].International Journal of Production Research, 2007,45 (15) : 3477-3503. 被引量:1
  • 5CHENG S C, SHIAU D F, HUANG Y M, et al, Dynamic hard-real-time scheduling using genetic algorithm for multiprocessor task with resource and timing constraints[J]. Expert Systems with Applications, 2009,36 (1) : 852-860. 被引量:1
  • 6SOMAN C A, VAN DONK D P, GAALMAN G. Comparison of dynamic scheduling policies for hybrid make-to-order and make-to- stock production systems with stochastic demand[J]. International Journal of Production Economics, 2006,104 (5) : 441-453. 被引量:1
  • 7XIANG W, LEE H P. Ant colony intelligence in multi-Agent dynamic manufacturing scheduling[J].Engineering Applications of Artificial Intelligence, 2008,21 (1) : 73-85. 被引量:1
  • 8HICKS C, SONG D P, EARL C F. Dynamic scheduling for complex engineer to-order products[J]. International Journal of Production Research,2007,45(15) :3477-3503. 被引量:1
  • 9CARICATO P, GRIECO A. An online approach to dynamic rescheduling for production planning applications[J]. International Journal of Production Research, 2008, 46 (16): 4597-4617. 被引量:1
  • 10Yue D, You F. Sustainable scheduling of batch processes under economic and environmental criteria with MINLP models and algorithms [J]. Computers & Chemical Engineering, 2013, 54:44-59. 被引量:1

共引文献23

同被引文献19

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部