已安沉管尾端钢封门前清淤施工风险防范 被引量:4

Preventive measures against risks of desilting in front of steel door of installed immersed tunnel section for Hongkong-Zhuhai-Macao Bridge
下载PDF
导出
摘要 港珠澳大桥岛隧工程隧道基槽已安装管节钢封门前清淤,主要为邻近管节碎石垫层铺设前及碎石垫层面的清淤施工。在该区域附近清淤施工,如操作不当或预案不足将会给已安隧道沉管带来不可接受的风险,因此有必要对在该区域清淤施工的相关细节进行充分研究。通过采取风险防范措施,取得了较好的施工效果。 The silt removal in front of the steel door of installed immersed tunnel tube In the Hongkong-Zhuhai-Macao Bridge Island & Tunnel project is executed before laying of the gravel bedding layer for the adjacent tunnel section and desilting on the suface of gravel bedding layer. While desilting in the mentioned areas, unacceptable risk will be caused to the foundation trench for immersed tunnel sections by improper operation or insufficient precautionary measures, therefore it is necessary to study full details of desilting. By taking the risk prevention measures, to achieve better construction effect.
作者 朱淋淋 何波 ZHU Lin-lin;HE Bo(CCCC Guangzhou Dredging Co., Ltd., Guangzhou, Guangdong 510221, China)
出处 《中国港湾建设》 2016年第7期101-104,共4页 China Harbour Engineering
关键词 沉管 清淤 施工风险 防范措施 immersed tube desilting construction risk preventive measure
  • 相关文献

参考文献3

  • 1中交公路规划设计院有限公司. 港珠澳大桥主体工程岛隧工程施工图设计:沉管隧道[R]. 2011. 被引量:1
  • 2中交股份联合体港珠澳大桥岛隧工程第IV 工区项目经理部.港珠澳大桥岛隧工程E14 管节末端钢封门前回淤基床处置施工安全保障专项措施[R]. 2014. 被引量:1
  • 3中交股份联合体港珠澳大桥岛隧工程第IV 工区项目经理部.港珠澳大桥岛隧工程沉管隧道基槽清淤施工方案[R]. 2012. 被引量:1

同被引文献12

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部