摘要
介绍江西柘林水电开发有限责任公司扩建工程 5号发电机定子在工地组装中遇到的一起绝缘故障的分析、查找及处理办法。
The paper introduces the mathod about the insulation trouble of the No. 5 generator stator assembled and installed on the extension project construction site at Jiangxi Zhelin hydro-power station , also, it presents the solutions for the searching and dealing with the insulation hitch.
出处
《江西电力》
2002年第4期11-13,16,共4页
Jiangxi Electric Power