摘要
探讨了工程成本与时间曲线为非线性时 ,成本与工期的优化问题。通过建立混合整数规划模型 ,提出了综合考虑成本与时间关系时工程计划的优化方法 。
The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear. By establishing a mixed integer programming model, an optimizing method of project planning for integratively considering the relations of cost and time is suggested, thus the accuracy of optimized result is improved.
出处
《江汉石油学院学报》
EI
CSCD
北大核心
2002年第3期98-100,共3页
Journal of Jianghan Petroleum Institute
关键词
工期
成本
混合整数规划模型
优化
project time limit
cost
mixed integer programming model