摘要
针对新桥矿通风系统存在的问题 ,结合矿山当前生产实际 。
Based on the existing problems in ventilation system and the current production of the mine, the optimum renovation measures of reducing windage and increasing blowing rate are put forward and implemented.
出处
《工业安全与环保》
2002年第10期33-35,共3页
Industrial Safety and Environmental Protection
关键词
矿井
通风系统
高硫矿床
技术改造
high sulfur contained mine ventilation system optimum renovation effect evaluation