7NERC.Available transfer capability definition and determination:reference document prepared by TTC Task Force[R].Princeton,NJ,USA:North American Electric Reliability Council,1996. 被引量:1
8GREENE S,DOBSON I,ALVARADO F L.Sensitivity of the loading margin to voltage collapse with respect to arbitrary parameters.IEEE Trans on Power Systems,1997,12(1):262-272. 被引量:1
9PALSSON M P,TOFTVAAQ T,UHLEN K,et al.Largescale wind power integration and voltage stability limits in regional networks// Proceedings of IEEE Power Engineering Society Summer Meeting:Vol 2,Jul 21-25,2002,Chicago,IL,USA:762-769. 被引量:1
10PABLO L,JULIO U.Minimum voltage protections in variable speed wind farms// Proceedings of IEEE Porto Power Tech Conference:Vol 4,Sep 10-13,2001,Porto,Portugal:6. 被引量:1