3Sen M K Stoffa P L.地震反演[A]..SEG美国勘探地球物理学家学会第60届年会论文集[C].北京:石油工业出版社,1992.237~380. 被引量:1
4HUANG Tian,LI Zhanxian,LI Meng.Conceptual design and dimensional synthesis of a novel 2-DOF translational parallel robot for pick-and-place operations[J].ASME Journal of Mechanical Design,2004,126(3):449-455. 被引量:1
5ZHANG Liangan,MEI Jiangping.Reformation of the transfusion bags'secondary packaging line using parallel robot[C] //Institute of Electrical and Electronics Engineers,International Conference on Mechatronics and Automation,August 5-8,2007,Harbin Engineering University,Harbin.Helongjiang:IEEE,2007:2 043-2048. 被引量:1
6MALATHRONAS J P,PERKINS J D,SMITH R L.The availability of a system of two unreliable machines connected by an intermediate storage tank[J].AIIE Transactions,1983,15(3):195-201. 被引量:1
7YERALAN S,FRANCK W E,QUASEM M A.A continuous materials flow production line with station breakdown[J].European Journal of Operational Research,1986,27:289-300. 被引量:1
8DALLERY Y,DAVID R.Approximate analysis of transfer lines with unreliable machines and finite buffers[J].IEEE Transactions on Automatic Control,1989,34(9):943-953. 被引量:1
9SORENSEN K,GERRIT K,JANSSENS.Buffer allocation and required availability in a transfer line with unreliable machines[J].Production Economics,2001,74:163-173. 被引量:1
10PAPADOPOULOS H T,VIDALIS M I.A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines[J].Computers&Industrial Engineering,2001,41:261-277. 被引量:1