摘要
On the basis of site investigation and data collection of a certain electro plating factory,the groundwater flow and solute transport coupled models were established by applying Visual MODFLOW 4.1 software,which was used to conduct a numerical simulation that forecast the transport process of Cr6+ in groundwater. The results show that contamination plume of Cr6+ transports with groundwater flow direction. Without control measures,in 3 650 days,19 wells for drinking would be contaminated,and the range of transport would be 52 172 m2,the maximum contamination would be 35.8 mg/L.