承台大体积防水混凝土冬期施工 被引量:1

WATER PROOF MASS CONCRETING IN PILE CAP CONSTRUCTION IN WINTER
下载PDF
导出
摘要 大体积防水混凝土冬期施工 ,控制混凝土的内外温差和温度变化造成的裂缝 ,提高混凝土的抗裂、抗渗性能 ,是施工的关键 ,施工时采取的措施是否可行 ,要通过结构计算加以验证 ,并依据理论计算数据调整施工工艺 ,从而有效地控制施工质量 ,且兼顾经济效益。 In water proof mass concreting in winter controlling cracks caused by temperature difference between the concrete and environment and temperature change, improving crack, seepage resistance of concrete are key problems to be taken seriously. Whether practicable or not, any technical measure adopted should be tested through calculation, and then have the technology adjusted according to theoretical calculation. In this way, the construction quality may be well controlled and thus profit gained.
作者 付金强
出处 《建筑技术》 北大核心 2002年第10期755-757,共3页 Architecture Technology
关键词 承台 大体积防水混凝土 冬期施工 连续浇筑 热工计算 mass water proof concrete construction in winter continuous concrete pouring thermal calculation
  • 相关文献

参考文献3

  • 1高勋华.高层建筑施工手册[M].北京:中国建筑工业出版社,1992.. 被引量:2
  • 2高勋华 赵志缙.高层建筑施工手册(第二版)[M].上海:同济大学出版社,1997.. 被引量:1
  • 3崔静忠 李启隶.冬期施工手册(第二版)[M].北京:中国建筑工业出版社,1998.. 被引量:2

共引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部