基于BIM的市政工程施工进度管理研究 被引量:41

Study on Construction Schedule Management of Municipal Engineering Based on BIM
下载PDF
导出
摘要 针对市政工程特点,通过分析市政工程进度管理现状,总结出市政工程进度管理低效率的原因,并提出基于BIM的市政工程项目进度管理的框架,包括基于BIM的进度管理模式、进度信息管控、基于BIM的进度信息系统。最后,将基于BIM的进度管理框架应用到上海市示范项目周家嘴路隧道,有效提升了项目进度管理水平。 This paper is aimed at the characteristics of municipal engineering,through the analysis of the status of municipal engineering progress management,and summarizes the reasons of low efficiency of progress management. This paper puts forward the framework of project schedule management of municipal engineering based on BIM,including the BIM based on the mode of progress management,progress information management and the BIM based on the progress of the information system. Finally,the schedule management framework based on BIM is applied to the demonstration project of Shanghai Zhoujiazui Road Tunnel. It effectively enhances the management level of project schedule.
出处 《施工技术》 CAS 北大核心 2016年第S1期768-771,共4页 Construction Technology
基金 上海市城乡建设和交通会建管项目(2014-009-002)
关键词 市政工程 BIM 进度管理 信息化 municipal engineering building information modeling schedule management information
  • 相关文献

参考文献1

  • 1牛博生.BIM技术在工程项目进度管理中的应用研究[D].重庆大学2012 被引量:2

共引文献1

同被引文献209

引证文献41

二级引证文献157

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部