摘要
针对某500kV变电站HGIS设备基础不均匀沉降问题,分析了不均匀沉降的原因,借鉴了一种处理不均匀沉降的新方法——降板调平法,并介绍了降板调平法及其处理过程,该方法首次应用于电力工程实际,取得了良好的技术和经济效益。
Based on the issue of uneven settlement of HGIS equipment foundation in a 500 kV substation,the reasons for uneven settlement were analyzed,and a new method of treating uneven subsidence of the drop plate leveling method was introduced. Meanwhile,the drop plate leveling method and process was introduced,which was first used in electric power engineering.
出处
《施工技术》
CAS
北大核心
2016年第S1期175-177,共3页
Construction Technology
关键词
基础
沉降
降板调平法
施工技术
foundations
settlements
the drop plate leveling method
construction