摘要 Based on the practices of construction supervision to cement grouting at the reservoir emptying and power tunnels of the TSQ stage Ⅰ Hydropower station, some issues on quality control of cement grouting of hydraulic tunnel are discussed, and corresponding suggestions are put forward for revision of current standard (SL62-94). It is regarded that the refilling grouting could not be used for remedying the thickness of concrete lining; the end sealing of refilling grouting section should not be neglected; higher grouting pressure would be used. For the consolidation grouting, grout return pipe should be placed at the grout hole top for pure pressure type grouting; five-grade water cement ratio of grout mix is suggested; a certain standard should be specified for changing the grout to thicker mix by skipping the intermediate grade; the standard for ending the grouting should be relaxed. In current grouting standard, some terms should be complemented for contact grouting of steel penstock and spiral case and for plug grouting of circular-anchor hole. Based on the practices of construction supervision to cement grouting at the reservoir emptying and power tunnels of the TSQ stage Ⅰ Hydropower station, some issues on quality control of cement grouting of hydraulic tunnel are discussed, and corresponding suggestions are put forward for revision of current standard (SL62-94). It is regarded that the refilling grouting could not be used for remedying the thickness of concrete lining; the end sealing of refilling grouting section should not be neglected; higher grouting pressure would be used. For the consolidation grouting, grout return pipe should be placed at the grout hole top for pure pressure type grouting; five-grade water cement ratio of grout mix is suggested; a certain standard should be specified for changing the grout to thicker mix by skipping the intermediate grade; the standard for ending the grouting should be relaxed. In current grouting standard, some terms should be complemented for contact grouting of steel penstock and spiral case and for plug grouting of circular-anchor hole.
出处 《人民长江》 北大核心 2002年第S1期82-86,共5页 Yangtze River
关键词 hydraulic TUNNEL REFILLING GROUTING CONSOLIDATION GROUTING contact GROUTING hole PLUG GROUTING Tianshengqiao Stage Hydro Power STATION hydraulic tunnel refilling grouting consolidation grouting contact grouting hole plug grouting Tianshengqiao Stage Ⅰ Hydro Power Station
  • 相关文献

参考文献1

  • 1PRC Electric Power Professional Standard.Construction Guideline of Prestressed Concrete Lined Anchorage Cable for Hydraulic Tunnel[]..1998 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部