摘要
本文以某污水处理厂直径为50m的污水沉池施工为例,介绍了混凝土工程结构约束分析、无缝施工计算以及施工方案的确定。
Concrete work structure restraining analysis, seamless construction calculation, and construction scheme determination was present in this paper based on the construction of a sewage secondary clarifier ofφ 50m.
出处
《膨胀剂与膨胀混凝土》
2011年第2期31-32,19,共3页
Expansive Agents & Expansive Concrete
关键词
混凝土无缝施工
补偿收缩
温度应力
环向拉应力
抗裂估算
concrete seamless construction, shrinkage compensating, temperature stress, circumferential tensile stress, anti-cracking estimate.