期刊文献+

浅述矿产地质勘察项目区内地质遗迹资源专项调查方法 被引量:3

In the project area of geological relic resources special investigation method of mineral geological survey
下载PDF
导出
摘要 以莱阳白垩纪地质公园为例,浅述拟建项目通过地质遗迹资源时所采用的专项调查方法。在拟建项目穿越地质公园的调查区范围内,布设调查点及穿越线路,重点确定拟建项目穿越地质公园区段内恐龙化石产出层位及拟建项目与地质遗迹位置关系。统筹兼顾工程建设与地质遗迹资源保护的关系,避免造成地质遗迹资源被破坏,并为工程选址提供资料依据。 Laiyang Cretaceous geological park, for example, a light above the special investigation methods proposed project through the geological heritage resources used. In the proposed project within the scope of the investigation through the Geopark area, laid survey sites and across the line, focusing on the proposed project to determine the cross section of dinosaur fossils in the Geopark and output layers of the proposed project and the positional relationship between geological heritage. Balanced construction and geological heritage conservation relations, to avoid destruction of geological heritage resources, and provide information on the basis for the project site.
作者 康桂玲
出处 《世界有色金属》 2016年第15期117-118,共2页 World Nonferrous Metals
关键词 地质遗迹资源 工程建设 专项调查方法 geological heritage resources construction special investigation methods
  • 相关文献

参考文献2

二级参考文献33

共引文献83

同被引文献8

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部