摘要
以莱阳白垩纪地质公园为例,浅述拟建项目通过地质遗迹资源时所采用的专项调查方法。在拟建项目穿越地质公园的调查区范围内,布设调查点及穿越线路,重点确定拟建项目穿越地质公园区段内恐龙化石产出层位及拟建项目与地质遗迹位置关系。统筹兼顾工程建设与地质遗迹资源保护的关系,避免造成地质遗迹资源被破坏,并为工程选址提供资料依据。
Laiyang Cretaceous geological park, for example, a light above the special investigation methods proposed project through the geological heritage resources used. In the proposed project within the scope of the investigation through the Geopark area, laid survey sites and across the line, focusing on the proposed project to determine the cross section of dinosaur fossils in the Geopark and output layers of the proposed project and the positional relationship between geological heritage. Balanced construction and geological heritage conservation relations, to avoid destruction of geological heritage resources, and provide information on the basis for the project site.
出处
《世界有色金属》
2016年第15期117-118,共2页
World Nonferrous Metals
关键词
地质遗迹资源
工程建设
专项调查方法
geological heritage resources
construction
special investigation methods