期刊文献+

旁多 直孔水库群联合优化调度方案研究 被引量:3

Study on joint optimization operation scheme for Pangduo reservoir and Zhikong reservoir
下载PDF
导出
摘要 西藏拉萨河干流中游已形成旁多、直孔水库组成的水电梯级结构。为了充分发挥两库的联合补偿作用,本文针对旁多、直孔水库群开展了联合调度方案研究。以原有水库单库调度方案为基础,建立了水库群联合调度模型,同时采用模拟-优化相结合的方法对联合调度模型进行求解,得到符合实际可操作的联合调度方案。长系列模拟结果表明:联合调度方案与原设计方案相比,水库群多年平均发电量为10.01×108 kW·h,增加了4.49%,同时两座水库发电量都有显著提高,取得了较为满意的结果。所制定的联合调度方案能够充分发挥水库群的联合调蓄作用,有效提高水能资源利用率。 The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middle reach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the paper studied the joint operation scheme for Pangduo reservoir and Zhikong reservoir. Based on the respective operation scheme, a reservoir group joint operation model is built, the model is solved by the simulation-optimization method, and then the practical and operational scheme is achieved. The scheme could give full play of the joint regulation and storage effect of the reservoir group and improve effectively the utilization factor of hydropower resources.
作者 王强 张继军
出处 《东北水利水电》 2018年第12期1-3,10,共4页 Water Resources & Hydropower of Northeast China
关键词 水库调度 梯级水库群 联合调度方案 模拟优化. reservoir operation cascade reservoirs joint operation scheme simulation optimization
  • 相关文献

参考文献5

二级参考文献30

共引文献92

同被引文献27

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部