期刊文献+

1000MW二次再热机组汽轮机热应力控制策略分析 被引量:2

The thermal stress control strategy of 1 000 MW double reheat steam turbine
下载PDF
导出
摘要 汽轮机的运行情况直接影响到整个机组的经济效益。在汽轮机启停以及运行过程中不可避免会产生热应力,若这些应力得不到相应的控制,可能导致汽缸裂纹、转子变形等严重后果。以上海汽轮机厂1000 MW二次再热超超临界汽轮机为例,主要对热应力产生情况及其控制方法进行分析讨论。 The operation of steam turbine directly affects the economic benefits of the whole unit.Thermal stress inevitably occurs during the start-up or stopping and operation of the steam turbine. If the stress is not controlled, it may lead to the serious consequences of the cylinder crack and the rotor deformation.Taken the 1000 MW double reheat Ultra-supercritical steam turbine of Shanghai steam turbine plant as an example,the thermal stress generation and its control methods are analyzed and discussed.
出处 《电力科技与环保》 2018年第6期22-23,共2页 Electric Power Technology and Environmental Protection
关键词 1000 MW发电机组 二次再热 热应力 温度裕量 温度准则 1000 MW unit double reheat thermal stress,temperature margin temperature criterion
  • 相关文献

参考文献4

二级参考文献15

共引文献25

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部