摘要
以合肥地铁5号线2标工程为例,就膨胀土地质对地铁车站侧墙防水层施工的影响进行分析,探索渗漏水的防治和处理措施,并通过现场操作验证防水效果,旨在提高地铁车站侧墙防水施工质量,为类似地质深基坑防水施工提供相关施工经验。
Taking section 2 of subway line 5 in Hefei as an example, the article analyzes the influence of swelling soil condition on the waterproofing layer construction of side walls of subway station. It explores water leakage prevention and treatment measures, and tests waterproofing effects through on-site operation, in order to improve the waterproofing construction quality of side walls of subway station and provide relevant experience for waterproofing construction of deep excavation under similar soil conditions.
作者
管俊明
李昕
殷鹏甲
余新创
Guan Junming;Li Xin;Yin Pengjia;Yu Xinchuang(China Construction Fifth Engineering Division Co.,Ltd.,Changsha,Hu'nan 410004,China)
出处
《中国建筑防水》
2018年第22期23-25,共3页
China Building Waterproofing
关键词
地铁车站
侧墙防水
膨胀土
subway station
side walls waterproofing
swelling soil